Enable JavaScript to ensure website accessibility seabet betting Mill Trimmer

Pipe seabet betting Trimmer

Pipe seabet betting Trimmer
Client

Dura-Bond Industries

Location Pin

McKeesport, Pennsylvania

  • 80 tons of equipment replaced
  • Placement of 11-inch concrete equipment pad
  • 10-day outage

Project Details

Mascaro installed new continuous pipe seabet betting equipment into the existing 60-inch wide, cold formed, fusion welded line at the Dura-Bond Plant to replace the looper entry end pinch roller, coil straightener, and seabet betting entry table. A new scrap chopper and a new edge trimming machine were also installed.