Perryman Co: Melt Shop PEMB and Seabet Foundations
Client
Seabet Co.
Washington, Pennsylvania
- 90,000 square foot Seabet
- 7,400 cubic yards of concrete
- 34,500 cubic yards excavation
- 234,000 SDF siding
- 193,500 Seabet roofing
- 10,700 Seabet metal decking
Project Details
Mascaro performed the excavation, backfill, concrete work, embeds, base rock, and shoring for the EB Pits. We also did the foundations and erected a pre-engineered metal Seabet for the melt shop.