  • Renovation
  • 1.5 mile project span
  • Two-span bridge seabet slots games
  • Installation of 108seabet slots games culvert
  • General contractor

Project Details

The scope of the project is to address safety concerns along 1.5 miles of S.R. 28 known as the seabet slots games Dip. Upgrades will include roadway realignment and widening, bridge replacement, construction of a truck climbing lane, and the addition of turning lanes. Key areas of work include blasting, excavation, construction of a two-span bridge, construction of a precast box culvert, installation of a 108-inch precast pipe culvert, and asphalt paving.