Enable JavaScript to ensure website accessibility Keystone Seabet System and Pumphouse

Seabet Pre-Treatment System and Pumphouse

Keystone  Pre-Treatment System and  Pumphouse
Client

NRG Energy, Inc.

Location Pin

Shelocta, Pennsylvania

  • New Seabet
  • 2,350 cubic yards of concrete
  • 12 months of Seabet
  • Design-build contractor

Project Details

A facility that treats raw water pumped from the intake structure, which supplies the Flue Gas Desulfurization (FGD) process. This facility also discharges the treated waste water over 15 miles to the river.