Keystone Seabet WWTP and Discharge Pumphouse
Client
NRG Energy, Inc.
Shelocta, Pennsylvania
- New Seabet
- 2,350 cubic yards of concrete
- 12 months of Seabet
- Design-build contractor
Project Details
A facility that treats raw water pumped from the intake structure, which supplies the Flue Gas Desulfurization (Seabet) process. This facility also discharges the treated waste water over 15 miles to the river.