Enable JavaScript to ensure website accessibility hydro seabet casino Electric Plant

Hydro electric seabet casino Plant

Hydro Electric Plant
Client

First Energy Corp.

Location Pin

New Jersey

  • Renovation of 107 seabet casino high dam intake structure
  • Erect two temporary steel cofferdams 23 seabet casino wide and 30 seabet casino tall with bypass piping
  • Install two 12 seabet casino by 30 seabet casino wheel gates with lift assemblies
  • 2,530 cubic yards of mass concrete

Project Details

Mascaro installed the upper reservoir emergency shutoff gate for this operating power generating station.