Hydro electric seabet casino Plant
Client
First Energy Corp.
New Jersey
- Renovation of 107 seabet casino high dam intake structure
- Erect two temporary steel cofferdams 23 seabet casino wide and 30 seabet casino tall with bypass piping
- Install two 12 seabet casino by 30 seabet casino wheel gates with lift assemblies
- 2,530 cubic yards of mass concrete
Project Details
Mascaro installed the upper reservoir emergency shutoff gate for this operating power generating station.