Enable JavaScript to ensure website accessibility siteseabet login Energy Locust Street Utility Extension

Clearway Energy Locust siteseabet login Utility Extension

Clearway Energy Locust siteseabet login Utility Extension
Client

siteseabet login Energy, Inc.

Location Pin

siteseabet login, Pennsylvania

  • 800 feet of new 8-inch DIP waterline
  • 35,000 linear feet of underground piping 
  • Four cast-in-place steam vaults
  • General contractor

Project Details

The utilitiesextension ran alongLocust, Marion, and Pride Streets. The scope includes the installation of three 4160V 2.5Mw diesel generators supplying emergency power, three 2,750 ton chillers supplying chilled water, three 50,000 lb/hr steam boiler systems supplying heating, a three-cell cooling tower, two 7.5 MVA transformers, insulated metal panels, masonry exterior, and drilled caisson foundations.

​​​​​​​