Enable JavaScript to ensure website accessibility AEP seabet best gambling site

AEP seabet best gambling site

AEP seabet best gambling site
Client

American Electric Power Company

Location Pin

West Virginia

  • Site preparation and underground utilities
  • Foundations
  • Trona mechanical installation
  • Final grading and paving
  • 2,000 lineal feet railroad track
  • 10,000 cubic yards of concrete

Project Details

Mascaro was selected to oversee several projects at the seabet best gambling site facility that included: limestone reclaim tunnel construction, gypsum storage building foundations and infrastructure, selective catalytic reduction (SCR) system installation, water treatment plant mechanical installation of piping, and installation of ZT Lines (2,800 linear feet of pipe, 5,640 linear feet of conduit).