  • 2,800 linear feet of pipe
  • 5,640 linear feet of conduit
  • 270 cubic yards of concrete

Project Details

Mascaro constructed a precast water collection pit to collect seabet my (rain, snowmelt, etc.) from the coal pile. The surface water seabet my is pretreated before it is pumped out for further/final purification. Construction included a sump (below-ground vault), tank foundation, power and instrument wiring, and piping from the tanks to the sump pump.