Enable JavaScript to ensure website accessibility seabet best gambling site|Home_Company, LP. All rights

seabet slots games

Keystone  Pre-Treatment System and  Pumphouse
Client

NRG Energy, Inc.

Location Pin

seabet slots gamesShelocta, Pennsylvania

  • New construction
  • 2,350 cubic yards of concrete
  • 12 months of construction
  • Design-build contractor

seabet myProject Details

A facility that treats raw water pumped from the intake structure, which supplies the Flue Gas Desulfurization (FGD) process. This facility also discharges the treated waste water over 15 miles to the river.