Enable JavaScript to ensure website accessibility seabet my|Free Bonus_seabet best gambling site

seabet app

Keystone FGD WWTP and Discharge Pumphouse
Client

NRG Energy, Inc.

Location Pin

SeabetShelocta, Pennsylvania

  • New construction
  • 2,350 cubic yards of concrete
  • 12 months of construction
  • Design-build contractor

Project Details

A facility that treats raw water pumped from the intake structure, which supplies the Flue Gas Desulfurization (FGD) process. This facility also discharges the treated seabet slots gameswaste water over 15 miles to the river.