Enable JavaScript to ensure website accessibility seabet my|Free Bonus_water that is collected

seabet my

Deicing Stormwater Treatment Plant Phase 2B
Client

Allegheny County Airport Authority

Location Pin

seabet myCoraopolis, Pennsylvania

  • 150,000 cubic yards of excavation
  • 400 linear feet of cast-in-place concrete weir wall
  • 2,500 linear feet of piping
  • 210,000 square feet of geosynthetic clay liner
  • 30,000 square feet of concrete revetment
  • Two pump houses

Project Details

The ponds serve as holding tanks for the contaminated water that is collected from rain run-off from the runway that contains de-icing.